Monday, July 20, 2015

Sarande Albania

 Docked at the "BIG SHIP"S" dock.
 Next we need to take on some water, but what a chore!!!
 Several sections of hose ( a regular fire fighter's hose) are connected totaling  approx. 150 feet long, with a "mega" nozzle is coupled together. This only took about 2 hours, and even then I had to come to the rescue. 
Finally we are ready to feed the hose through the back door into the inspection hole in the top of the tank, and we are ready to take on water. 

No comments: